Heckmondwike Grammar School required a two-storey classroom block to expand teaching capacity without interrupting daily school life. The building had to be craned into position over existing school structures, which required a temporary road closure and careful scheduling of works outside school hours.
Originally intended as a short-term hire solution, the block proved so robust and effective that the school retained it for over 20 years.

The design provided flexible, well-equipped teaching spaces with modern finishes, natural light, andICT integration. Safety, sustainability, and architectural
harmony with the existing site were all central to the project’s success.

What was meant to be a temporary solution became a 19-year fixture that more than served its purpose. Elite were professional throughout and always on hand when needed. When the building was finally removed, it was nearly as good as the day it was installed.
Heckmondwike-Grammar-Logo

Miss E Bennett

Site Manager

 

logos

 

client

Client

Heckmondwike Grammar School

sector

Sector

Education

location-1

Location

Heckmondwike, West Yorkshire

 

The Main Features

Outside

Externally, the two-storey modular classroom block was delivered in 14 precision-manufactured modules and installed using a carefully planned crane-lift operation over existing school buildings. A strong steel structural framework provides long-term strength and stability, while plastisol-coated steel cladding offers excellent weather resistance and low ongoing maintenance.

Large double-glazed aluminium windows maximise natural daylight and improve energy efficiency, contributing to a bright internal environment. The overall design was in keeping with the existing school campus and surrounding environment, integrating seamlessly with the site while delivering a robust, long-term solution that remained fully operational for over 20 years.

Inside

The internal spaces were designed to create bright, comfortable, and adaptable learning environments that support modern teaching methods. Classrooms are well-proportioned and flexible, allowing layouts to be reconfigured to suit different class sizes and teaching styles. Integrated ICT infrastructure, including interactive whiteboards and projector systems, ensures the spaces are fully equipped for technology-led learning.

Durable, low-maintenance interior finishes were selected to withstand continuous daily use, while robust flooring and fire-rated internal doors ensure long-term safety and compliance. Energy-efficient lighting with prismatic diffusers, combined with natural and mechanical ventilation systems, provides a comfortable, healthy environment for both students and staff.


heckmondwike grammar modular classroom interior layout

Challenges & how we overcame them

Complex Site Conditions

Delivering a large, two-storey modular block within a fully operational school required careful sequencing and risk management. Construction  activity had to be planned to avoid disrupting teaching while maintaining the highest safety standards. Every stage, from deliveries to craning, was meticulously managed to balance operational continuity with construction efficiency.




Road Closure Constraints

The installation demanded temporary closure of the busy road running alongside the school. This presented significant logistical and community challenges, requiring approval from local authorities and clear communication with residents. Careful scheduling ensured closures happened at low-traffic times, minimising disruption and maintaining safety for the school and surrounding neighbourhood.

Out-of-Hours Installation

Craning modules into position directly over existing buildings could not be undertaken during teaching hours. Works were scheduled at night and weekends, requiring additional staff shifts, specialist supervision, and enhanced safety protocols. This ensured students and staff were unaffected, while allowing the project to progress smoothly without compromising operational timelines.

Structural Lifting Requirements

The project involved lifting heavy two-storey modules over existing school buildings, a task requiring precision engineering and highly trained crane operators. Strict safety measures were enforced to protect the site and surrounding community. By working with specialist contractors and robust planning, the modules were installed successfully without incident, ensuring project success.

Minimising Disruption to Learning

The school remained open throughout the project, so protecting the learning environment was paramount. Noise, dust, and restricted access routes had to be carefully controlled. Temporary barriers and phased works ensured classes continued without interruption. This balance between construction activity and uninterrupted education required constant coordination with school leadership.

Longevity Beyond Expectation

Although originally designed and installed as a short-termhire solution, the classroom block performed so well it was kept in place for20 years. This unexpected longevity posed

challenges for maintenance and upgrades. However,the durable finishes and flexible design ensured the building remained compliant, safe, and fully functional throughout.

Back to top

The Results

The Heckmondwike Grammar School classroom block provided an immediate, high-quality expansion of teaching space with minimal disruption.Although originally intended as a temporary hire, the building’s strength,adaptability, and modern specification enabled it to remain in use for over two decades.

Internally, the classrooms delivered bright, flexible, and technology-rich learning environments. Externally, the building integrated seamlessly into the school campus. This project highlights the long-term value of well-designed modular buildings and demonstrates how temporary solutions can become enduring assets.