Chellow Heights

Chellow Heights Special School

Working with Bradford City Council, we developed and factory manufactured an integrated 6 x classroom module for Chellow Heights Special School.
Pilton Infants School red cedar clad building

Pilton Infants School

Elite Systems were approached by to manufacture 3 classrooms at Pilton Infants School in Devon, England.
Grey modular building front with double doors. The roof, windows and doors are in a darker blue-grey colour. Behind the building there is a cream brick wall. Warrington Hospital.

Warrington Hospital

Warrington and Halton Hospitals NHS Trust contacted Elite Systems to design, manufacture and install a multi-purpose building. Here's the full case study.
Holland Park Primary School

Holland Park Primary School

Essex County Council recommended us to Sigma Trust to replace a classroom at Holland Park Primary School in Clacton-on-Sea with a new 164.7 sqm building.
Blackmore Primary School

Blackmore Primary School

Essex County Council hired us to revitalize Blackmore Primary School by replacing an outdated classroom with a new 86 sqm modular facility.
Royal Bolton Hospital

Royal Bolton Hospital

The covid-19 pandemic heightened the need for specialized healthcare space, prompting Royal Bolton Hospital to seek a same-day emergency care (SDEC) center to alleviate A&E congestion.
Bardney Playgroup

Bardney Playgroup

From steel pile foundations to a distinctive pitched roof and cedar cladding, our West Yorkshire factory and on-site efforts delivered an aesthetically pleasing and functionally sound building for Bardney Playgroup.
Denton Community College';s new buiding in a bright blue colour with white uPVC windows

Denton Community College

Tameside Borough Council urgently needed extra classroom space at Denton Community College, approaching us for a new modular building within eight weeks. Our rapid design, manufacturing, and on-site construction ensured the completion of a six-classroom block before the new school year.
Four classroom building at Alder Community High School

Alder Community High School

We stepped in to deliver a four-classroom building for Alder Community High School after a previous supplier failed. Collaborating closely, we finalized the design with large windows and roof lights. Despite a tight timeframe, our communication and efficiency ensured timely completion.
View: SGS WISE gatehouse

SGS WISE gatehouse

Elite designed and built a distinctive gatehouse for South Gloucester and Stroud College's 'WISE' campus, featuring a modern façade for the vocational centre. The modular construction, with a unique floating roof structure, full-height glazing, and natural cladding materials, provides a warm and contemporary welcome to campus visitors.
View: Blake’s Lock

Blake’s Lock

Situated on a lock island on the River Kennet, the compact site needed resilient materials to withstand the elements and potential flooding. Read on to see how we designed and installed this unique build - it involved panels and pontoons.
Danesgate Community SEN modular building

Danesgate Community Pupil Referral Unit

We were asked by York’s Danesgate Community to create a highly bespoke pupil referral unit to allow a single pupil with additional needs to remain in the York education system.
royal_surrey_county_hospital

Royal Surrey County Hospital

Royal Surrey County Hospital approached Elite with a challenge: build a 20-bed isolation ward in just four months as part of the hospital’s COVID-19 response.
Cheadle Hulme School Nursery Project playground

Cheadle Hulme School

We created a fully accessible, low carbon footprint modular building to accommodate the reception class at Cheadle Hulme School.
Hamford primary academy front view

Hamford Primary Academy

We created a fully accessible, low carbon footprint modular building to accommodate growing pupil numbers at Hamford Primary School.
The entrance to the National Grid modular building

Helping National Grid Grow

Our modular off-site solution helped meet the growing space demands of National Grid, quickly and effectively.