Managing accommodation across several schools presents different challenges for Multi-Academy Trusts (MATs). Each academy may have its own teaching requirements, building conditions, pupil numbers, and site constraints, while the Trust remains responsible for overseeing investment and maintaining appropriate standards across its estate.

A modular building for schools can help Multi-Academy Trusts manage these requirements by providing a consistent approach to design, construction, and project delivery, while allowing individual buildings to be tailored to each academy.

From additional classrooms and specialist SEND facilities to larger sixth form accommodation, modular construction enables Trusts to address different needs without adopting an entirely separate delivery approach for every project.

In this article, we explore how modular buildings can support MATs managing accommodation requirements across multiple school sites, including quality, specifications, project coordination, and budget planning.


Why Do Multi-Academy Trusts Face Different Accommodation Requirements Across Their Schools?

Although academies may belong to the same Trust, their accommodation requirements are rarely identical.

A primary school may require additional classroom capacity, while a secondary academy needs specialist teaching facilities or a replacement building. Other schools may face challenges associated with ageing accommodation, limited site space, or accessibility.

For central estates teams, this means balancing the needs of individual schools with the wider priorities and available resources of the Trust.

Decisions may involve determining which projects should be prioritised, how building standards can be maintained and how construction programmes can be coordinated across different locations.

Modular construction offers an approach that can accommodate these differences while providing a consistent method of delivering new school buildings.

For a broader look at how modular construction supports Trust estate strategies, the article Why More Multi-Academy Trusts Are Choosing Modular Construction
may also be helpful.

Supporting Different Teaching Requirements Across Multiple Academies

One of the advantages of modular construction is its ability to accommodate different types of educational facilities.

Rather than being restricted to standard classroom layouts, modular buildings can be designed around the specific teaching, accessibility, and operational requirements of each academy.

For example, a Multi-Academy Trust may require:

    • Modular school classrooms to provide additional teaching accommodation at a primary school.
    • Specialist SEND facilities incorporating accessible spaces, sensory rooms, and individual learning areas.
    • Science laboratories and IT suites with specialist equipment, services, and internal layouts.
    • Sixth form facilities providing classrooms, independent study areas, and student facilities.
    • Replacement teaching buildings where existing facilities no longer meet educational requirements.

These buildings can share common standards for construction quality and performance while incorporating different designs and specifications.

For MATs, this means each academy can receive accommodation appropriate to its needs without compromising the Trust's wider expectations for building quality.

Establishing Consistent Building Standards Across A Trust

When commissioning buildings for several schools, maintaining consistency can help simplify estate management.

Trusts may wish to establish common expectations for building performance, internal finishes, accessibility, and maintenance requirements.

Modular construction can support this approach through established manufacturing processes and quality assurance procedures.

Standardising Specifications Without Using Identical Designs

A Trust may choose to establish preferred specifications for elements such as:

    • Heating, ventilation, and temperature control.
    • Lighting and electrical installations.
    • Flooring, wall finishes, and internal doors.
    • Energy efficiency and building performance.
    • Accessibility and welfare facilities.
    • Materials and components that support ongoing maintenance.

These preferences can provide a starting point for future building projects.

However, the final specification should still reflect the requirements of each academy.

For example, a SEND building may require specialist accessibility features and adapted internal environments, while a sixth form building may need larger teaching spaces and different building services.

The benefit is not that every school receives the same building, but that the Trust can maintain consistent expectations while allowing appropriate site-specific design.


Maintaining Quality Throughout Manufacturing

Because modular buildings are manufactured predominantly offsite, established production and inspection procedures can be applied throughout the manufacturing process.

For MATs commissioning projects across several academies, this provides an opportunity to work with a supplier using consistent quality management procedures.

It also helps establish clearer expectations around materials, workmanship, inspections, and completion standards.

Coordinating Modular Building Projects Across Different School Sites

Managing building projects across multiple academies involves more than selecting the appropriate accommodation.

Each site may have different access arrangements, ground conditions, existing infrastructure, and operational restrictions.

A school with extensive grounds may offer several potential locations for a new building, while an urban academy may have limited space for deliveries, cranes, and construction activities.

These differences need to be considered individually.



Assessing Each School Site

Before a modular building project progresses, site investigations and feasibility assessments help establish whether the proposed accommodation can be delivered.

Important considerations include ground conditions, foundation requirements, utility connections, drainage, access routes, and the proximity of existing buildings.

Although modular construction follows an established manufacturing approach, foundation solutions and installation arrangements may differ considerably between schools.

For further guidance, download the Foundation Solutions for Modular Buildings Guide which explains common foundation options and the importance of site investigations.


Managing Construction Around School Operations

Construction activities also need to be coordinated around the operational requirements of individual academies.

Examinations, safeguarding arrangements, school holidays, and access restrictions can influence when work takes place.

With modular construction, building manufacture and onsite preparation can progress concurrently, helping reduce the overall construction programme.

For Trusts overseeing several projects, this can support more coordinated planning, although each academy will still require its own construction programme and site management arrangements.

How Can Modular Construction Support A Consistent Project Delivery Process?

Where a Multi-Academy Trust commissions several building projects, working with an established delivery process can help reduce the administrative demands placed on central estates teams.

A turnkey modular building provider can coordinate activities such as site surveys, design development, planning support, groundworks, manufacturing, installation, and internal fit-out.

This can help establish clearer responsibilities and communication arrangements throughout the project.

For example, a Trust commissioning buildings at three different academies may have different design requirements and construction programmes at each site.

However, the projects can still follow a consistent approach to feasibility assessments, design approvals, progress reporting, quality inspections, and handover.

This familiarity can be particularly useful where estates teams are responsible for coordinating projects alongside their day-to-day management responsibilities.

It is also important to establish responsibilities at the outset, particularly where the Trust, individual academy, consultants, and contractors are all involved in project decisions.

For education leaders commissioning a modular building project, our Understanding Roles and Responsibilities in Modular Construction Guide provides further guidance on the key roles and responsibilities involved. 

Managing Budgets And Project Priorities Across Multiple Schools

Multi-Academy Trusts often need to allocate available capital funding across several academies, each with different accommodation priorities.

Some projects may be required immediately, while others can be planned for future financial years.

A consistent approach to assessing modular building requirements can help Trusts compare proposals and understand the likely investment involved.

Where similar building types or specifications are required, previous projects may provide useful reference points for early budget discussions.

However, costs should always be assessed individually.

Building size, specialist facilities, site preparation, foundations, delivery arrangements, and utility connections can all influence the final project cost.

For this reason, comparing the complete project requirements is more useful than relying on a standard price per square metre.

Trusts should also consider ongoing building performance, maintenance requirements, and operational costs when evaluating proposals.

A coordinated approach can help decision-makers assess individual projects within the context of the wider estate budget.

Examples Of Modular Buildings Meeting Different School Requirements

Completed education projects demonstrate how modular construction can accommodate different teaching and operational requirements while maintaining an established approach to design, manufacturing, and delivery.

South Wolds Academy – Permanent Sixth Form Accommodation

At South Wolds Academy in Nottinghamshire, Elite Systems delivered a two-storey permanent modular building providing additional sixth form and teaching accommodation.

The £2.4 million project included classrooms, specialist teaching spaces, and supporting facilities, with the building installed as part of an existing school campus.

The project demonstrates how modular construction can accommodate larger education facilities where available site space and ongoing school operations need to be considered.


Ravenscliffe Sports College – Specialist SEND Facilities

At Ravenscliffe Sports College, Elite Systems delivered a purpose-designed modular building to support specialist educational provision.

The £1.06 million project incorporated accommodation developed around the needs of pupils requiring additional support, demonstrating how modular buildings can be tailored to more specialised educational requirements.

Although these projects were commissioned for different education settings, they illustrate how a consistent construction approach can support very different building specifications.

For Multi-Academy Trusts, this is particularly relevant when considering projects across schools with different pupil needs and teaching priorities.


What Should Multi-Academy Trusts Consider Before Commissioning Modular Buildings Across Multiple Sites?

Before commissioning modular buildings across several academies, Trusts should establish a clear understanding of each school's requirements and how individual projects will be managed.

Key considerations include:

    • Accommodation requirements
      Identify the teaching spaces, specialist facilities, and supporting accommodation required at each academy.
    • Site suitability
      Assess available space, access, ground conditions, and existing infrastructure before confirming building proposals.
    • Building specifications
      Establish which quality, performance, and maintenance standards should remain consistent across the Trust.
    • Project responsibilities
      Agree who will manage approvals, budgets, design decisions, and communication between the Trust, individual academies, and contractors.
    • Construction programmes
      Consider how projects will be scheduled around academic activities, safeguarding requirements, and available funding.
    • Procurement
      Review suitable procurement routes, including relevant public sector frameworks, and ensure the proposed approach meets the Trust's requirements.

Addressing these considerations early can help estates teams maintain oversight of several projects while allowing each academy's requirements to be assessed individually.

Delivering Consistency Without Compromising Individual School Requirements

For Multi-Academy Trusts, managing accommodation across several academies requires a balance between consistency and flexibility.

While each school may have different teaching requirements, site constraints, and investment priorities, there are opportunities to establish common expectations for building quality, specifications, and project delivery.

Modular construction can support this approach by providing a consistent manufacturing and delivery process while allowing individual buildings to be designed around the needs of each academy.

Whether a Trust requires additional classrooms at one school, specialist SEND accommodation at another, or a larger teaching facility elsewhere, modular construction offers a practical way to deliver different education buildings through a coordinated approach.

 

Planning Modular Building Projects Across Your Trust?

Elite Systems designs, manufactures and delivers permanent modular buildings for schools, including classrooms, specialist SEND facilities and larger teaching accommodation.

Our turnkey approach covers site surveys, design, groundworks, manufacture, installation, and completion, helping Trusts coordinate building projects from initial planning through to handover.

Whether you're considering a project at one academy or have accommodation requirements across several schools, our team can help you explore the options available.