Even though off-site construction is a simpler process than traditional building, there are still definite advantages to using a company which can support every step of the process. That’s why Elite Systems offers a turnkey service offering expert guidance from the first meeting to the last lick of paint.

Devising the concept and design

The first step in any project is deciding what the customer wants. When choosing off-site construction, several factors can influence this decision. How many rooms are required? And how high will the structure go – single storey or multiple floors? Whereabouts will the building be located?

At Elite, we take the time to discuss those questions with our customers and run through the options in an initial design meeting so that they can be certain that they have covered all the angles. From there, we are able to put together the plans and provide a quotation.

We strive to keep customers informed throughout the process, and our use of BIM allows customers to see what the finished product will look like before manufacturing begins.   The added advantage of this approach is that the final cost will not differ from the initial quote, helping customers to plan and control their expenditure.

Managing the planning process

A question we are asked repeatedly is whether or not planning permission and building regulations still apply to modular buildings. The answer is ‘yes’: that’s why we offer an in-house service covering both building regulations compliance and planning approval.

Our experience in securing planning permission means that there is no back and forth between the property owner and the local authority. We will liaise with the council’s planning officer and manage the full process, including submitting the plans in the correct format and assisting with the Environmental Impact Assessment.

From there, the next step is the building regulations application, which covers the functionality and structural performance of the building to ensure that it complies fully with Building Regulations 2010. The regulations look at the robustness and safety of the finished building as well as taking account of fire safety, drainage, potential for contamination, ventilation and more. At Elite, we ensure that all of our structures achieve or exceed the standards required by the current regulations and manage the full process of securing approval from the relevant building control department.

Construction and installation run concurrently

Once planning permission is secured from the local authority, groundworks can begin on-site. Elite’s team of skilled tradespeople will dig foundations, liaise with utilities providers to ensure that all connections are in place so that the final structure can be easily dropped into place.

The construction works begin at the same time in our specialist factory, where the building is assembled by a highly-qualified team of modular building specialists, ready to be installed on-site. The final step in the process is dropping the finished building into place and connecting all utilities. Exterior cladding (which starts in the factory) is finished off on-site, as is plastering and painting – both of which is undertaken by Elite’s tradespeople.

How long is the modular construction process?

Using a company that can manage the design and construction process from start to finish is the most efficient way to ensure that a project is completed in a timely manner.

After the initial discussion, we can generate plans and a quotation within a week, which puts the customer in an excellent position going into the planning process. This is where delays can occur: securing planning permission and building regulations approval can take anything from six weeks to three months depending on the local authority, so taking advantage of an experienced team which is well-versed in the process is worthwhile. At Elite, we can turn around the planning application within two weeks, so delays are kept to a minimum.

The rest of the process is simple: the groundworks will run alongside the factory build, so within four to six weeks the structure will be ready to installed. As the time on site should take just a couple of weeks, the whole process takes no more than three or four months from – design to décor.

To speak to one of our team about how modular construction could benefit your project please call 01274 873 232